E
–
Sequence
of
Operation
E
‐
2
Compressor
Circuit
Operation
Piping
schematic
for
compressor
circuit
is
shown
on
Pic.
E.1.
When
a
demand
requires
the
compressor
to
operate,
the
following
sequence
occurs:
‐
Once
blower
operation,
related
safeties
and
timers
are
confirmed
by
the
control
system,
the
pump
down
solenoid
valve
opens
and
once
pressure
stabilizes,
the
compressor
starts.
‐
Reheat
valve
diverts
portion
of
hot
gas
into
the
reheat
coil.
Remainder
of
the
hot
gas
goes
into
outdoor
condenser
(or
water
‐
cooled
heat
exchanger,
coupled
with
fluid
cooler
or
external
fluid
cooling
system)
and
(if
applicable)
pool
water
heat
exchanger.
o
Dehumidifier
with
pool
heating
option
:
pool
valve
diverts
portion
of
hot
gas
into
pool
water
heat
exchanger,
based
on
pool
water
heating
demand.
o
Outdoor
condenser/fluid
cooler
fan
is
engaged
only
if
hot
gas
is
diverted
outdoors/to
water
‐
cooled
heat
exchanger
and
compressor
pressure
is
higher
than
pre
‐
set
level
(see
Outdoor
Condenser
and
Fluid
Cooler
Operation
below).
‐
Once
demand
for
the
compressor’s
operation
is
removed
(respective
call
is
satisfied),
the
pump
down
solenoid
valve
closes;
once
the
compressor
suction
pressure
reaches
the
pre
‐
set
pressure,
the
compressor
stops.
Outdoor
Condenser
and
Fluid
Cooler
Operation.
Based
on
the
type
of
the
outdoor
condenser
or
fluid
cooler
fans’
type
(two
‐
speed
fans
or
EC
‐
type/modulating
fans),
respective
signal(s)
are
sent
by
control
system
to
engage
said
fan(s):
for
two
‐
speed
fans
‐
on/off
signals
(switching
speeds,
based
on
compressor
head
pressure
level),
for
EC
‐
type
fans
‐
variable
0
‐
10VDC
signal
(proportional
to
the
compressor
head
pressure
level).
Refer
to
the
fans’
type
and
wiring
diagram
if/when
needed.
If
the
fluid
cooler
is
equipped
with
the
built
‐
in
pump
package
(to
establish
cooling
fluid
flow
between
dehumidifier
and
the
fluid
cooler
or
to
serve
as
additional/booster
pump),
the
said
pump
is
also
engaged
along
with
fluid
cooler
fans
–
pump
would
stay
engaged
while
fans
are
engaged
(regardless
of
the
fans’
speed).
Pic.
E.1
Summary of Contents for CLASSIC NE-002
Page 3: ...B Table of Content B 2 This page is left blank...
Page 10: ...C General Information OMM C S SL 01 C 7 February 2020 Pic C 4 B...
Page 17: ...D Layout and Components D 6 This page is left blank...
Page 21: ...E Sequence of Operation E 4 This page is left blank...
Page 25: ...F Interface and Communication F 4 This page is left blank...