SOL-96.110.071 / 180122
TOPAZ Aluminum
Startup
25
5
Wait until the photometer has been filled with fresh water. Then
set “SV Filling” to <OFF>.
6
Open the <PUMPS> tab.
7
Press the <ON> button next to “P1 - Buffer pH6-6.2”.
8
Let the pump run until the fluid has reached the photometer and
there is no more air in the tube.
This takes approximately 2.5 minutes. The pump stops
automatically.
9
Repeat steps 7–8 with pumps “P2 - Phenantroline” and
“P9 - HCl 2N + 400µg Al”.
ON
ON
ON
ON
OFF
OFF
OFF
OFF
P1 - Buffer
P1 - Buffer pH6-6.2
P2 - Phenantroline
P3 - Pyrocathecol Violet
P9 - HCl 2N + 400μg Al
ACTUATOR
4-20mA OUTPUT
PUMPS
RELAYS
INPUTS