51
9.
Switch Setup
9.1 Switch Basic Setup
This screen is to set up Switch Hardware that is used for MULTI USER CPE.
You can set up VLAN at the top of the screen. VLAN setup is used when operating 4 internal LAN
ports of MULTI USER CPE in a group and separately. Values between 1 and 4096 can be assigned
for VLAN and each VLAN may get meaningful name. VLAN supports the tagged/untagged mode.
Items at the bottom set up the priority of each port management and whether or not to protect
against Broadcast Storm hacking.
Summary of Contents for SWC-1104
Page 1: ...SEOWON INTECH...
Page 11: ...11 2 1 Wired Connection WAN Modem Router Wired PC or HUB connection...
Page 12: ...12 2 2 WiMAX Wired LAN Connection CPE...
Page 38: ...38 The screen shows all sorts of status information on WAN access 6 3 WAN Status Information...
Page 53: ...53 9 3 Switch Debug Setup R100...
Page 58: ...58 10 4 System Log R100 Browse...