background image

Page

9 of 9 

Document No.U086951

     

Date

Jan/11/2019 

Leaking or corroded sprinklers must be replaced.   
Automatic Sprinklers must be kept in a cool and dry place. 
Automatic sprinklers must never be physically altered, such as painted, plated, or coated, once shipped from the 
factory. If the sprinklers have been in any way modified, they must be replaced. 
Great caution must be applied to prevent damage to the sprinklers at all stages - before, during, and after installation. 
Damaged units because of dropping, hitting, over-tightening, or wrench slippage, must be replaced. 
When remodeling, such as by adding false beams or light fixtures or changing the location of compartment walls, first 
verify that the new construction will not violate the installation requirements of the applicable standards of NFPA. 
Alter the new construction and/or the sprinkler system to suit the requirements of this document and the applicable 
NFPA regulations. 
The owner is responsible for the maintenance of the sprinkler system, including inspection and testing of its 
compliance with this document, as well as the standards of the National Fire Protection Association (e.g., NFPA 25), 
and the regulations of any other authorities having jurisdiction. The owner should direct any questions regarding the 
above rules and regulations to the installing contractors or the sprinkler manufacturer. It is recommended that 
automatic sprinkler systems be inspected, tested, and maintained by a qualified Inspection Service in accordance 
with NFPA 25. 

 
 

ORDER PROCEDURE 

 
When placing an order, please contact a local distributor with the following information (Model Name, Temperature Rating and 
Finish). 
 

Sprinkler 

Model: FR-QR K5.6 
Temperature Rating: 162°F (72°C), 205°F (96°C), 286°F (141°C) 
Finishes: Natural Brass, White Painted, Black Painted, Chrome Plated 

For Type, SIN, and Recessed Escutcheon, refer to the table below. 

Type SIN 

Recessed 

Escutcheon Temperature 

Approvals 

Upright SS2552 

 

162°F, 205°F, 286°F 

Pendent SS2551 

 

162°F, 205°F, 286°F 
162°F, 205°F 

c

UL

us

, FM 

Recessed Pendent 

SS2551 

D1 (1/2” total adjustment) 

286°F 

Recessed Pendent 

SS2551 

D2 (3/4” total adjustment) 

162°F, 205°F, 286°F 

c

UL

us

 

 

Recessed Escutcheon 

  Model: D1 Recessed Escutcheon (Inner Ring and Outer Ring, 1/2” total adjustment) 

  Model: D2 Recessed Escutcheon (Inner Ring and Outer Ring, 3/4” total adjustment) 

Finishes: Brass Plated, White Painted, Black Painted, Chrome Plated 

 

Tools for Installation 

  Wrench FR-S (Open-end wrench type) 

  Socket FR-H (Socket wrench type) 

For use with a 1/2" drive ratchet (not included) 

 

Summary of Contents for FR-QR

Page 1: ...as well as in compliance with the applicable standards of the National Fire Protection Association regulations and the standards of any other authorities having jurisdiction In the event of this condi...

Page 2: ...Page 2 of 9 Document No U086951 Date Jan 11 2019 FIGURE 1 Model FR QR K5 6...

Page 3: ...s Quick Response Sprinklers 3 Listed by UL for use in Canada as Quick Response Sprinklers 4 Approved by FM as Quick Response Sprinklers OPERATION The sprinkler assemblies fusible link is comprised of...

Page 4: ...sition reaction forces resulting from sprinkler operation could alter its orientation and its water distribution pattern Obstruction to Water Distribution Locations of sprinklers must follow the obstr...

Page 5: ...t the position Installing Procedure Install Model FR QR sprinklers by the steps and figures shown below Use only D1 or D2 Recessed Escutcheons with Model FR QR Pendent sprinklers Use of any other rece...

Page 6: ...Page 6 of 9 Document No U086951 Date Jan 11 2019 FIGURE 3 UPRIGHT PENDENT and RECESSED PENDENT SPRINKLERS FIGURE 4 INSTALLATION CORRECT and INCORRECT FIGURE 5 INSTALLATION WRENCH...

Page 7: ...e 7 of 9 Document No U086951 Date Jan 11 2019 FIGURE 6 PROTECTOR REMOVAL FIGURE 7 INSTALLATION SOCKET A 1 2 drive ratchet not included is required for use with the Socket FR H FIGURE 8 PROTECTOR REMOV...

Page 8: ...preparation for maintenance of the fire protection system permission to close the main control valve must be obtained from the proper authorities and all affected parties by this action and must be i...

Page 9: ...and the regulations of any other authorities having jurisdiction The owner should direct any questions regarding the above rules and regulations to the installing contractors or the sprinkler manufac...

Reviews: