background image

UT279

UT279 Series

service 

instructions

1371631

IMSIUT279a

EN

U T 2 7 9   S e r v i c e   I n s t r u c t i o n s

ENGLISH

Summary of Contents for UT279 Series

Page 1: ...UT279 UT279 Series service instructions 1371631 IMSIUT279a EN UT279 Service Instructions ENGLISH...

Page 2: ...4 Installation of housing 4 1 The filter should be installed vertically with the cover pointing upwards 4 2 The minimum clearance required for element removal is as follows 4 2 1 111mm 4 4in for leng...

Page 3: ...hen the normal operating temperature is reached If the gauge continues to show high pressure after system warm up replace the filter element 6 3 If the electrical pressure switch actuates e g red ligh...

Page 4: ...whether arising out of or in connection with the manufacture packaging delivery storage use misuse or non use of any of its products or any other cause whatsoever 4 7 Filter element servicing During...

Page 5: ...d Assembly 1 2 Cover 1 3 Indicator options 2 Gauge Pressure switch See product literature 4 O ring cover to head See product literature 1 Z fluorocarbon UT279SKZ 5 O ring head to tank See product lite...

Page 6: ...UT279 UT279 Series s e r v i c e instructions 6 7 Figure 2 6 5 1 3 4 2 RETURN LINE IN TANK FILTERS...

Page 7: ...1 25 tapped hole 3 places C L within 1 52 mm 06 in vertically of 43 79 2 03 mm 1 724 080 in 102 1 0 38 mm 4 020 015 in 48 3 0 76 mm 1 901 030 in 5 21 1 52 mm 205 060 in 56 64 0 38 mm 2 230 015 in 79 3...

Page 8: ...he web at www pall com Pall Corporation has offices and plants throughout the world in locations including Argentina Australia Austria Belgium Brazil Canada China France Germany Hong Kong India Indone...

Reviews: