UT279
UT279 Series
service
instructions
1371631
IMSIUT279a
EN
U T 2 7 9 S e r v i c e I n s t r u c t i o n s
ENGLISH
Page 1: ...UT279 UT279 Series service instructions 1371631 IMSIUT279a EN UT279 Service Instructions ENGLISH...
Page 2: ...4 Installation of housing 4 1 The filter should be installed vertically with the cover pointing upwards 4 2 The minimum clearance required for element removal is as follows 4 2 1 111mm 4 4in for leng...
Page 3: ...hen the normal operating temperature is reached If the gauge continues to show high pressure after system warm up replace the filter element 6 3 If the electrical pressure switch actuates e g red ligh...
Page 4: ...whether arising out of or in connection with the manufacture packaging delivery storage use misuse or non use of any of its products or any other cause whatsoever 4 7 Filter element servicing During...
Page 5: ...d Assembly 1 2 Cover 1 3 Indicator options 2 Gauge Pressure switch See product literature 4 O ring cover to head See product literature 1 Z fluorocarbon UT279SKZ 5 O ring head to tank See product lite...
Page 6: ...UT279 UT279 Series s e r v i c e instructions 6 7 Figure 2 6 5 1 3 4 2 RETURN LINE IN TANK FILTERS...
Page 7: ...1 25 tapped hole 3 places C L within 1 52 mm 06 in vertically of 43 79 2 03 mm 1 724 080 in 102 1 0 38 mm 4 020 015 in 48 3 0 76 mm 1 901 030 in 5 21 1 52 mm 205 060 in 56 64 0 38 mm 2 230 015 in 79 3...
Page 8: ...he web at www pall com Pall Corporation has offices and plants throughout the world in locations including Argentina Australia Austria Belgium Brazil Canada China France Germany Hong Kong India Indone...