5. Service Instructions
1).
Make sure the machine is de-energized from its power source using proper Lock-Out Tag-Out (LOTO)
procedures before servicing.
2).
Remove the bolts (7x) located on the top of the mid-hopper that are securing it to the frame in order to
adjust it for servicing. (See figure 1 on following page). There is an 8
th
bolt hole in the back, using it is optional.
3).
In order to remove the main cutting chamber, first loosen the bolts around the sides of the mid-hopper
sleeve; there are 12 bolts, located near the top of the mid-hopper. (See figure 2 on following page). There are
four (4) bolts on front, left, and right, none on back.
4).
Once the bolts are loosened and the mid-hopper sleeve is lowered, you can then pull the main cutting
chamber away from the support frame. (See figure 3 on following page).
5).
Remove the bolts that hold the cutting chamber in place. They are the two swing bolts that pivot located on
the front of the machine (See figure 4 on following page).
6).
Use the provided machine jack to open up the mid-hopper in order to service the cutting chamber. (See
figure 4 on following page). Make sure that the safety clips are locked in place before servicing the machine.
7).
After knives and or other services are completed, lower cutting chamber and mid-hopper using machine
jack. Disengage the safety pins in order to lower the chamber back into position.
8).
Secure cutting chamber using the swing bolts from step 4. (See figure 4 on following page).
9).
Push cutting chamber back into position under the support frame. Realign the holes on the mid-hopper with
the holes on the frame in order to make the next two steps easier.
10).
Raise mid-hopper sleeve and secure the sleeve to the frame using the bolts that were removed in step 1.
11).
Secure the mid-hopper sleeve back into place using the 12 bolts that were loosened in step 2.