3.1 Pre-Operation Checklist
After all electrical and mechanical machine elements have been inspected and any defects corrected, the
following pre-operational checklist should be used to ensure the disintegrator is ready for operation:
•
Have all installation and preparation instructions been read and followed?
•
Have the disintegrator operator and all other necessary personnel been fully trained on
machine operation and all machine safety mechanisms?
•
Have sufficient location clearances been allowed?
•
Has the equipment been grounded as required by local codes and/or Article 250 of the National Electric
Code?
•
Have all motors been checked for rotation?
•
Have all machine controls, buttons, and limit switch safeties been checked for proper functioning?
•
Have the cutting and screen chambers been checked for foreign matter?
•
Have the drive belts been checked for alignment and tension?
•
Is the machine properly closed with all visible fasteners tight?
•
Are all accessory components electrically and mechanically connected with proper support and with all
fasteners tight?
•
Are the cyclonic air separator and filter bags empty? (optional equipment)
•
Has the fan/cyclone been verified for proper rotation direction?
•
Are all electrical enclosure boxes tightly closed and clamped shut?
•
Are all personnel clear of the machine?
•
Does the machine have the correct size security screen for the desired particle outcome?
•
Have the dust filter tubes been shaken? (Do this with the fan motor off.)