![SELMI TANK 200 User And Service Manual Download Page 27](http://html1.mh-extra.com/html/selmi/tank-200/tank-200_user-and-service-manual_1237110027.webp)
TANK
23
4.3. Installation of the machine
After carrying out the positioning operations and
connection to the electricity main, proceed with the
following operations:
•
Cleaning the supplied accessories
Attention
Make sure that no objects used during
installation have been left in the tank; if so,
remove them.
4.4. Commissioning
Check that all of the above-described procedures
were done correctly.
Check that the emergency button is not pushed; if it
is, release it.
Power-on the machine by pressing the button on the
main switch. The display on the control panel will
light up to show that the machine is in STAND-BY.
Check that the safety and emergency protections
and control devices are working correctly.
Make sure the work zone is free of all objects not
needed for work and that there are no oil stains on
the floor.
4.5.
Installation
of
the
delivery
pedal
chocolate
To connect the pedal it will be necessary to insert the
plug (1) in the socket located at the back of the
machine.
1
Summary of Contents for TANK 200
Page 1: ...A...
Page 2: ...B...
Page 40: ...TANK 36 7 TECHNICAL DIAGRAMS 7 1 Technical diagrams...
Page 41: ...TANK 37...
Page 42: ...TANK 38...
Page 43: ...TANK 39...
Page 44: ...TANK 40...
Page 45: ...TANK 41...
Page 46: ...TANK 42...
Page 47: ...TANK 43...
Page 48: ...TANK 44...
Page 49: ...TANK 45...
Page 50: ...TANK 46...
Page 51: ...TANK 47...