Attachment point at pin “E” must be fixed in all directions.
A
The dimension C is nominal. In this area the thickness of the deck should not exceed 30 mm. If the deck is
thicker than 30 mm, it should be possible to reduce this with a cavity. This will allow the clearance for the top
forward drum edge. If the deck is of sandwich construction, ensure that water cannot enter the core material and
cause structural damage.
Furlex TD incorporates an adjustable fork terminal for fine adjustment of the under deck dimension ”D”.
For larger gaps: use a custom made stainless steel bar or rod stay. Short wire pendants are not recommended as
the forestay load may not be distributed evenly.
2.3 Hull attachment
The lower bearing assembly of the Furlex TD system is to be considered as an extension of the forestay fitting
inside the hull. As it is locked horizontally at deck level, there is a toggle fitted between the lower bearing
assembly and the forestay/luff section. This toggle, together with the universal joint function of the adapter
tube, will create the required articulation as per the guiding principle, item 3.1.
Check that the through-deck fitting does not interfere pulpit, navigation lights or other deck fittings.
Check that the anchor well drains freely. Make sure that the forestay fitting in the anchor well is designed
and constructed to take the full forestay load.
For dimensions - see page 4.