![Sega Virtua Cop 3 Deluxe Type Service Manual Download Page 57](http://html1.mh-extra.com/html/sega/virtua-cop-3-deluxe-type/virtua-cop-3-deluxe-type_service-manual_1233610057.webp)
54
ITEM
DESCRIPTION / REFERENCES
INTERVAL
INSTALLATION OF
THE MACHINE
When the machine is installed perform the following
checks:
·
Check to see that each setting is as per the standard
settings input at the time of shipment. 3.9
·
In the INPUT TEST mode, check each switch. 3.9.3
·
In the OUTPUT TEST mode, check each of the lamps.
3.9.4
·
Test on-IC-Board IC's in the self-test mode. 5.2.1
Monthly
MEMORY
·
This test is automatically executed by selecting RAM
TEST, or ROM BOARD TEST in the Menu mode. 5.2
Monthly
PERIODIC CHECKS Periodically perform the following
·
MEMORY TEST. 5.2
·
Ascertain each setting.
·
In the INPUT TEST mode, test the control devices.
5.2.4
·
In the OUTPUT TEST mode, check each of the lamps.
5.3.2
Monthly
CONTROL SYSTEM
·
In the INPUT TEST mode, check each switch and
·
Adjust or replace each switch and
Monthly
MONITOR
(Projector)
·
In the CRT TEST mode, check to ensure the monitor
(projector) is adjusted correctly. 5.2.6
·
Clean screen - (switch off machine and remove the
plug). Do not use a water jet.
Monthly
Weekly
IC BOARD
MEMORY TEST 5.2
·
In the SOUND TEST mode, check the sound related
ROMs. 5.2.5
Monthly
DATA CHECK
·
Check such data as held in the bookkeeping screens,
relating to number and length of plays. 5.2 & 5.3.5
Monthly
EXTERIOR
MAINTENANCE
·
Clean surfaces
Monthly
COIN MECHANISM
·
Check switch operation (if fitted)
Monthly
Summary of Contents for Virtua Cop 3 Deluxe Type
Page 12: ...9...
Page 48: ...45 3 16 COMPOSITION OF THE GAME BOARD...
Page 88: ...85 8 3 VCT 0520UK ASSY BILLBOARD DX...
Page 91: ...88 8 5 VCT 1000UK ASSY PTV CABI DX...
Page 113: ...LOCATE A3 SCHEMATIC DRAWING 1 HERE...
Page 114: ...LOCATE A3 SCHEMATIC DRAWING 2 HERE...