SEELEY INTERNATIONAL - INSTALLATION MANUAL
|
7
ILL1152-B
ILL1153-B
ILL1154-B
ILL1155-C
ILL987-B
The air cooler is designed to be partially dismantled in order to
reduce the weight for installation.
COOLING PAD FRAME REMOVAL
To remove the Cooling Pad Frame, first disengage the top clips
of the pad frame using a screw driver as shown.
Then hold the pad frame with both hands and pull it towards
you as shown. See diagram. This disengages the side clips.
Then lift the frame up and out as shown. See diagram. Do this
with each Cooling Pad Frame.
DISMANTLING THE COOLER
DISMANTLING THE COOLER
cont.
REMOVING THE VENTURI/FAN
IMPORTANT!
Ensure the motor plug has been removed from
the control box before removing the venturi (see page 19 for
removal of plug).
With both arms hold each side of the Venturi/fan assembly.
Press the large clips at each side and lift the Venturi/fan
assembly upwards and carry it out of the cabinet.
Note!
Ensure the steel restraint cable and motor cable are
secured against the side of the venturi by the sticker provided.
(When restraining cable is fitted - TBA450 60Hz models and
TBA550 all models).
Place the Venturi/fan assembly carefully aside until the cooler
has been completely installed.
You cannot install the various components of the air cooler
unless you remove the Venturi/fan assembly first.
REMOVING THE TRANSITION
Turn the cooler onto its side to remove the Transition. It is held
to the cabinet for transport with big clips. The Transition can be
pulled off the cabinet with a strong pull by the installer. If it is
difficult to remove, squeeze the clips together and then pull. See
diagram. The Transition is now ready to be fitted onto the duct.
ILL1093-E