![SEELEY INTERNATIONAL AIRA DU SD Series Installation And Operation Manual Download Page 3](http://html.mh-extra.com/html/seeley-international/aira-du-sd-series/aira-du-sd-series_installation-and-operation-manual_1233142003.webp)
DU/SD SERIES INSTALL OPERATION MAINTENANCE MANUAL
|
1
SAFETY
1.0 Introduction
3
1.1 General Safety Information
3
1.1.1 Handling The Unit
3
1.1.2 Positioning The Heater
3
1.1.3 Combustibles
3
1.1.4 Wiring Electrical
3
1.1.5 Occupational Health And Safety
4
1.1.6 Gas Piping
4
1.1.7 Commissioning, Recommissioning, Decommissioning 4
1.1.8 Operational Safety
4
1.1.9 Gas Compliance
4
1.1.10 Safety Points To Consider
4
GENERAL INFORMATION
2.1 Unit Overview
6
2.2 Equipment Receipt
6
2.3 Factory Unit Test
6
2.4.1 Unit And Component Identification
7
2.4.2 Construction
7
2.4.3 Blower
7
2.4.4 Fan Motors
8
2.4.5 Pulleys
8
2.4.6 Dampers
8
2.4.7 Electrical Control And Connection
8
INSTALLATION INFORMATION
3.0 Installation Information
9
3.1 Model Variations And Dimensions
10
3.1.1 Dimensions - Single Exchanger No Blower DU / SD
10
3.1.2 Dimensions - Single Exchanger With Blower DU / SD 11
3.1.3 Dimensions - Dual Exchanger No Blower DU / SD
12
3.1.4 Dimensions - Dual Exchanger With Blower DU / SD
13
3.2 Installation
14
3.2.1 Location
14
3.2.2 Clearance Around Unit
14
3.2.3 Plant Room
15
3.2.4 Weight And Location
15
3.2.5 Lifting
16
3.2.6 Positioning And Securing
16
3.2.7 Duct Connections
17
3.2.8 Flue Connections
17
3.3 Electrical Connections
18
3.3.1 Electrical Supply
18
3.3.2 User Control Configuration Options
19
3.3.3 Blower / Fan Setup
19
3.3.4 Electrical Differences For Dual Heat Exchangers
19
3.4 Gas Connections
19
3.4.1 Gas Supply
19
3.4.2 LPG
20
3.4.3 Gas Supply For Dual Heat Exchangers
20
3.4.4 Gas Train Information
20
3.4.5 Gas Pressure Valve
21
3.4.6 Operating Pressure Of The Gas Valve
22
3.4.7 Setting Gas Valve Pressure
22
3.4.8 Setting The Modulating Valve Motor
23
3.4.9 Pilot Injector Setup
24
3.4.10 Aeration Plates
24
COMMISSIONING INFORMATION
4.1 Unit Details
25
4.2 General Installation Check
25
4.3 Electrical Checks
25
4.3.1 Electrical Installation Checks
25
4.3.2 Blower Box Checks
25
4.4 Gas Checks
26
4.4 1 Incoming Gas Supply Checks
26
4.4.2 Gas Train Check
26
4.4.3 Setting The Modulating Valve Motor
27
4.4.4 Modulating Motor Operational Check
27
4.5 Setting Controls
27
4.5.1 High Limit Control
27
4.5.2 Thermostat And User Controls
28
4.5.3 RLU Screens
28
4.6 Flow Adjustment Through Lever And Damper Blades
29
4.7 General Operation
30
4.8 Setting Unit Functional Parameters
31
4.9 Commissioning Results
31
OPERATING INSTRUCTIONS
5.1 Startup - Wall Switch Units To Provide Heat
32
5.2 Startup - Wall Switch Units To Provide Ventilation
32
5.3 Shutdown - Wall Switch Units Providing Heat
32
5.4 Shutdown - Wall Switch Units Providing Ventilation
32
5.5 BMS Startup And Shutdown
32
5.6 Operational Flowchart
33
5.6.1 Heating Flowchart
33
UNIT MAINTENANCE
6.0 Service And Maintenance
34
6.1 Heater Maintenance
34
6.1.1 Heater Maintenance
34
6.2 Major Service/Component Replacement Process
35
6.2.1 Electrical Components
35
6.2.1.1 Electrical Wiring
35
6.2.1.2 Isolator Fitted And Operational
35
6.2.1.3 Single Or 3 Phase Power Test
35
6.2.1.4 Overtemp Control Switch
35
6.2.1.5 Thermostat Fitted And Operational
35
6.2.1.6 Fan And Motor
35
6.2.1.7 Belts
36
6.2.1.8 Pulleys
36
6.2.1.9 Fan Direction
36
6.2.2 Gas Components
36
6.2.2.1 Gas Controls
36
6.2.2.2 Gas Connection Visual Inspection
36
6.2.2.3 Gas Isolation Fitted
37
6.2.2.4 Gas Supply Pressure
37
6.2.2.5 Gas Burner Pressure (High/Low)
37
6.2.2.6 Gas Injectors
37
6.2.2.7 Draft Diverters
37
6.2.2.8 Pilot Assembly
37
6.2.2.8.1 Cleaning Pilot Burner:
37
6.2.2.9 Leaving Air Sensor
38
6.2.3 Casing Components
38
6.2.3.1 Weatherproof Casing Condition
38
6.2.3.2 Duct Condition
38
6.2.3.3 General Installation
38
6.2.3.4 Access To Unit
38
6.2.3.5 Maintenance Records
38
6.3 Fault Finding
39
6.3.1 Fault Finding Heater
39
6.4 Replacement Parts List
40
APPENDIX
A: AGA Type B Information
41
B: Electrical Information
42
C: Gas Train Information
43
D: Commissioning Report
45
E: Temperature Rise Over Heat Exchanger
E1 - Leaving Air Temp Exceeds 40°C
47
E2 - Set Temperature Cannot Be Reached
47
E3 - Set Temperature Achieved, Modulating Controls Temp 48
F: Maintenance
F1 - Maintenance Schedule
49
F2 - Monthly Maintenance Check
50
F3 - Maintenance Checklist
51
G: Warranty Information
G1 - How To Register Your Product Warranty
53
G2 - Warranty Terms And Information
54
H: Release Information
57
CONTENTS