Kicker Cable Tiebar
9
HYDRAULIC STEERING
KICKER CABLE TIEBAR
Figure 12.
STEP 10:
Link Arm Installation and
Inspection
• Install Rod End Sleeve onto 5/16" cable rod leaving 1–2 threads
visible (DO NOT tighten completely). See Figure 12a.
• Install remaining components as per Figure 12.
• Physically inspect the two shafts (kicker cable shaft and link arm)
confirming that they are
Parallel
with each other (not binding,
twisting or any other mechanical interference). See Figure 12b.
If the two shafts are not
parallel
, adjust the 3/8" nuts on the drag
link assembly until the two shafts are parallel with each other.
• Physically inspect to ensure that 1–2 threads of the 5/16" cable
rod showing.
Failure to ensure 1–2 threads are showing may lead to binding of
the Kicker Cable Tiebar.
9/16"
22 ft-lb
MUST LEAVE
1–2 THREADS
SHOWING
ROD END
SLEEVE
KICKER CABLE SHAFT AND DRAG LINK
MUST BE
PARALLEL
AND IN LINE WITH
EACH OTHER
1
2
ADJUTS NUTS (ITEMS 1 AND 2)
TO ENSURE THE TWO SHAFTS
ARE
PARALLEL
THEN TIGHTEN
AND TORQUE
CAUTION
STEP 11:
Final Connections
• Grease and install Kicker Cable through the kicker engine steering/
tilt tube.
• Ensure the cap seal is installed to prevent contamination in the
steering/tilt tube area. (See Figure 13 on page 10.)
• Install kicker engine drag link.
NOTE:
SeaStar Solutions does NOT provide the drag link required for
the final connection, contact your engine manufacturer for this item.
NOTICE
Figure 12a.
Figure 12b.