Latest products and information available at www.sealite.com
9
TRIDENT-3000-HEX with hexagonal aluminium tower
3000mm dia. Ocean Buoy
Hexagonal Tower Assembly
Parts required for tower assembly:
STEP 6
Stand the hexagonal tower upright on a level surface (take care not to damage insulating spacers
fitted to base of tower). Install standard and optional mechanical hardware:-
• 5 x Horizontal grab rails with M8 Socket Head Cap Screw, flat and spring washers and plain nut (12
places)
• 1 x Top Mark assembly with M8 Socket Head Cap Screw, 2 x flat washers, a spring washer and
plain nut (4 places)
• 1 x Wind Sensor Post with M8 Socket Head Cap Screw, 2 x flat washers, a spring washer and plain
nut (4 places)
• 3 x Number Plates and backing plates with M6 Socket Head Cap Screw, 2 x flat washers and self-
locking nut (12 places)
Hexagonal Tower
Description
Qty
Hexagonal Tower with vertical
grab-rails, lantern spacer, insulating
spacers (on base) & optional
passive radar reflector
1
Horizontal Grab Rail
5
M8 x 40mm Long S/S Cap Screw
12
Ø8 S/S Flat Washer
12
Ø8 S/S Spring Washer
12
M8 S/S Plain Nut
12
Hexagonal Tower Options
Description
Qty
Top Mark
1
M8 x 40mm Long S/S Cap Screw
4
Ø8 S/S Flat Washer
8
Ø8 S/S Spring Washer
4
M8 S/S Plain Nut
4
Sensor Post
1
M8 x 40mm Long S/S Cap Screw
4
Ø8 S/S Flat Washer
8
Ø8 S/S Spring Washer
4
M8 S/S Plain Nut
4
Number Plate (Number or Letter per
order)
3
Backing Plate
3
M6 x 25mm Long S/S Bolt
12
Ø6 S/S Flat Washer
24
M6 S/S Self-Locking Nut
12
Summary of Contents for TRIDENT-3000-HEX
Page 2: ...Technical Specifications ...