![Sealite TRIDENT-3000-HEX Installation And Service Manual Download Page 8](http://html.mh-extra.com/html/sealite/trident-3000-hex/trident-3000-hex_installation-and-service-manual_1227832008.webp)
Latest products and information available at www.sealite.com
8
TRIDENT-3000-HEX with hexagonal aluminium tower
3000mm dia. Ocean Buoy
STEP 4
Fit and secure 2 of the 4 Float Straps around the top, and 2 of the 4
Float Straps around the bottom of the Float.
Position 2 x Float Straps on the ground and join the two Straps
together by placing 1 x Tie Rod through the holes and 1 x M16 Nut
on each side.
Repeat this for the second set of Straps.
Wrap the Float Straps around the Float Section and join the loose
side using a Tie Rod and 2 x nuts. Repeat for the second Float
Strap
When the Float Straps are fitted in position tighten the nuts on the
Tie Rods and add a Spring Washer and second nut to each side.
Tighten all nuts securely.
STEP 5
Use a crane to turn the Float and Mooring Post upright.
Please Note:
The buoy weighs around 3 tonnes when fully
assembled. Please be careful when rotating or otherwise lifting
the Buoy.
The buoy will be unstable after turning upright. Secure with heavy chocks and tie in
place where possible. Assembly staff must be careful when working in proximity to the
buoy and particularly if standing on any part of the buoy.
Summary of Contents for TRIDENT-3000-HEX
Page 2: ...Technical Specifications ...