Latest products and information available at www.sealite.com
17
TRIDENT-3000-HEX with hexagonal aluminium tower
3000mm dia. Ocean Buoy
Installation of Outstanding Electronic Equipment
STEP 13
Install any outstanding electronic equipment (eg. solar regulator, data logger, terminal box) in the
battery boxes and install associated wiring. Tie all cables in place using UV-stabilized cable ties.
STEP 14
Install and secure batteries in place using supplied battery clamps.
STEP 15
Connect all negative (-) and positive (+) leads to the battery terminals.
Cover the terminals with a protective grease after connection and testing is finalised.
STEP 16
Test the lantern by covering it with a dark cloth or jacket and wait 1 minute for activation.
Refer to the lantern manual for information on setting flashing codes, intensity or other variables and
for troubleshooting.
Summary of Contents for TRIDENT-3000-HEX
Page 2: ...Technical Specifications ...