Latest products and information available at www.sealite.com
11
TRIDENT-3000-HEX with hexagonal aluminium tower
3000mm dia. Ocean Buoy
Attaching Hexagonal Tower to Mooring Post
STEP 9
The hexagonal tower is to be located on the mooring post deck with the ladder centred across one of
the deck lifting eyes.
Position the float assembly so that the required location for the ladder/lifting-eye is pointing up.
Look for a pre-determined location for the tower ladder which is sometimes indicated
on the mooring post
Summary of Contents for TRIDENT-3000-HEX
Page 2: ...Technical Specifications ...