Page 5 of 17
To Test your power supply cord:
1.
Plug power supply cord into a grounded 3
prong outlet.
2.
Press RESET
3.
Press TEST (listen for click, Reset button
will trip and pop out).
4.
Press and release RESET (listen for click;
Reset button will latch and remain in). The
power supply cord is ready for operation.
NOTES:
•
The reset button must be pushed in for
proper operation.
•
The power supply cord must be replaced if
it fails to trip when the test button is
pressed or fails to reset.
•
Do not use the power supply cord as an
off/on switch. The power supply cord is
designed as a protective device.
•
A damaged power supply cord must be
replaced with a new power supply cord
obtained from the product manufacturer
and must not be repaired.
•
The power supply cord contains no
user serviceable parts. Opening the
tamper-resistant case voids all warranty
and performance claims.
INSTALLATION INSTRUCTIONS
________________________________________________________________________________________
Unpacking
Remove packaging materials
•
Remove and dispose of/recycle packaging
materials. Remove tape and glue residue
from surfaces before turning on the air
conditioner. Rub a small amount of liquid
dish soap over the adhesive with your
fingers. Wipe with warm water and dry.
•
Do not use sharp instruments, rubbing
alcohol, flammable fluids, or abrasive
cleaners to remove tape or glue. These
products can damage the surface of your
air conditioner.
•
Handle air conditioner gently.
1. Remove the air conditioner from the carton
and place it on cardboard.
2. Remove shipping screws from the rear of
the cabinet.
3. Remove the window lock bracket and
screw from the air conditioner and set
aside.
4. Remove the ground screw and ground
wire from the front of the air conditioner
base. Save the ground screw.
5. Pull on handles to slide air conditioner out
of cabinet. Place air conditioner on
cardboard.
NOTE:
Do not push, pull or remove any expanded
polystyrene (foam) from inside the air conditioner. It is not
packing material.