6. Mark and drill mounting holes on the jamb for the top strike per the strike template (see figure 12).
Fasten the top strike to the jamb with the screws supplied (see figure 13).
STEP 5: TEST OPERATION
1. Depress the push bar. The top and bottom latches should be held retracted. The bottom latch
should also clear the floor and the bottom strike. Door can now be opened.
2. Release push bar, both the top latch bolt and the bottom latch bolt should be fully extended.
3. Check device operation by depressing and releasing push bar several times to assure final
installation is correct.
4. Repeat device operation by opening and closing door several times using the
outside trim to make sure all installations have no problems.
5. Repeat adjustment procedure if either the top latch bolt is not held
retracted, or bottom latch bolt does not clear floor and bottom strike.
STEP 6: INSTALL COVERS
1. Before installing covers, check and secure top and bottom latch
bolts engagement. Adjust strikes if necessary.
2. Install the chassis and top & bottom assembly covers and the
two rod guides (see figure 14).
Figure 13
Figure 14
NOTE:
Attach third screw last after
strike
has been properly aligned,
Figure 12
P:\INST INSTRUCTIONS\EXIT DEVICES\INST-S6200 Rev A 04-22 Page 7
SECURITY DOOR CONTROLS ■ WWW.SDCSECURITY.COM
[t] 800.413.8783 ■ 805.494.0622 ■ E-mail: [email protected] ■ 801 Avenida Acaso, Camarillo, CA 93012 ■ PO Box 3670, Camarillo, CA 93011