schwa-medico OPErATING MANuAL - EMP 4 ECO+
50
Program 5 + u5:
Gate C Endorphin release
Type of stimulation Gate control on channel 1 + endorphin release on
channel 2
Parameter
Frequency channel (black) and (red)(red): 100 Hz
Frequency channel (grey) and (yellow): 2 Hz
Pulse width: 200 μs
Time: 20 min
Symbol on the
display during
stimulation
Description
Channel (black) and (red) are working with a 100
Hz frequency (80-120 Hz in the user mode). Channel
(grey) and (yellow) are working with a 2 Hz fre-
quency (0.5-10 Hz in the user mode).
phase 1
phase 2
build-up phase
run-down phase
working phase
pause
phase
pulse width
T = 1/f
}
channel 2
Channel 1
phase 1
phase 2
build-up
phase
run-down
phase
200 µs
T = 1/f
pause
phase
pulses
time
time
intensity
intensity
time
min
frequency
Hz
10
20
30
50
100
frequency
Hz
3
6
50
100
2
2
time
s
0,25
time
s
0,5
0,75
working
phase
working
phase
1
frequency
Hz
7,5
15
50
100
time
s
7
8
70
time
s
intensity
mA
2
time t
s
intensity I
mA
75 µs
}
}
time
intensity
build-up phase
run-down phase
run-down phase
working phase
pause
phase
7
8
70
time
intensity
2
Program 6 + u6:
Gonarthrosis / Coxarthrosis
Type of stimulation Han
Parameter phase 1
Frequency: 100 Hz
Pulse width: 100 μs
Time: 3 s
Parameter phase 2
Frequency: 2 Hz
Pulse width: 200 μs
Time: 3 s
Time: 20 min Phase 1 and phase 2 are alternating
every 3 seconds.
Symbols on the
display
Phase 1
Phase 2
Description
phase 1
phase 2
build-up phase
run-down phase
working phase
pause
phase
pulse width
T = 1/f
}
channel 2
Channel 1
phase 1
phase 2
build-up
phase
run-down
phase
200 µs
T = 1/f
pause
phase
pulses
time
time
intensity
intensity
time
min
frequency
Hz
10
20
30
50
100
frequency
Hz
3
6
50
100
2
2
time
s
0,25
time
s
0,5
0,75
working
phase
working
phase
1
frequency
Hz
7,5
15
50
100
time
s
7
8
70
time
s
intensity
mA
2
time t
s
intensity I
mA
75 µs
}
}
time
intensity
build-up phase
run-down phase
run-down phase
working phase
pause
phase
7
8
70
time
intensity
2