When routing the supply hose along a crane column, ceiling, wall or floor, note
that the vacuum hose can contract by up to 15% when the vacuum is applied. It
must therefore be laid loosely with length compensation. Longer, straight line
stretches can also be bridged with plastic pipes. The total length should not
exceed 50 m. Long supply hoses reduce the carrying capacity and the dynamics
of the tube lifter.
5.2 Mounting the suction pad
Position the grip (2) in the center of the gripper (1).
Pull the bracket (3) and rotate the grip (2) clockwise until it stops;
release the bracket (3).
The latching bolt (4) must engage so that the connection disc cannot
be twisted. out of position on the suction pad.