INSTALLATION
26 | EN
www.schmalz.com
30.30.01.00174/06
5 Installation
Please read section 1.6 (Requirements & instructions for installation,
maintenance and operating staff) before starting installation.
5.1 Connecting the vacuum tube lifter Jumbo, attaching the hoses
Procedure:
1. Lay out the compressed air hose/vacuum supply hose with a
diameter of 500 mm.
2. Attach first suspension band in a loop about 1.2 m from end
of
hose
3. Attach remaining bands after each complete circle of hose
coil
4. Insert carrier unit for supply hose in crane rail
5. Fit snap hook in carrier unit or securing clamp.
6. Insert the carrier unit for vacuum tube lifter
J
UMBO
F
LEX
into the crane jib.
7. Attach end buffer to end of crane jib.
8. Mount vacuum tube lifter
J
UMBO
F
LEX
with rotary
union in the carrier unit and secure using the
retaining split pin.
9. Connect supply hose to the rotary union connection
tube and secure using hose clamp.
WARNING
Risk of load breaking off due to incorrect mounting
Falling parts could hit people in the vicinity, causing death or serious injury!
►
The vacuum tube lifter Jumbo must be attached to the suspension eye of the
rotary union!
ATTENTION
Damage to the supply hose or compressed air hose due to incorrect
mounting
Hose lines become damaged eventually resulting in system failure.
►
The supply hose or compressed air hose must hang freely. It must not touch,
rub against or get caught up in other parts, or it can prematurely wear or tear.
►
When attaching the hose lines, make sure they remain in a coil (ø at least
500 mm).