OPERATING INSTRUCTIONS
1
0
CG700 rondo
Version: 27202 -
D
Schmalenberger GmbH + Co. KG
D-72072 Tübingen / Germany
4.3
Installation preparations / Concrete pool
Tailor the installation kit:
Place the installation kit on the formwork board and transfer the bore holes. Bore the holes
into the pool-side formwork board (D). Mark out and cut holes into the outer formwork
board (P) for the suction and pressure supplies and the two hoses.
Screw the installation kit complete with the mounting protection film (C) tightly to the pool-
side formwork board.
fig. 11
fig. 12: Rear view of the installation kit
BWSP
Pool water level
C
Mounting protection film
D
Pool-side formwork board
P
Outer formwork board
1
Pressure pipe DN 50
2
Suction pipe DN 65
3
Switching tube
4
Air supply to the non-return
air valve
Warning! Risk of damage!
•
The installation kit must be horizontal.
•
The distance between the centre of the installation kit and the water level
(
BWSP
) must be 275 mm.
8452
8453