Before preparing the machine for installation and start-up, an accurate visual control is
required in order to detect any possible damages occurred during transporting and handling
phases.
Your machine is located on a wooden grid and the
package is a waterproof plastic cover.
If one, or several parts of the machine, have been
damaged while shipping, the installation of the machine
has to be suspended.
While lifting take care of these points:
•
Always lift and carry the machine from the handles.
•
Use a steel rope capable of carrying 500 kg.
•
Do not forget the Mobil Control Panel.
•
Take precautions for handling and lifting.
•
Check if the load is properly balanced by lifting it
some centimetres.
•
Lift the machine, proceeding with care, without
sudden accelerations or quick changes of directions.
•
Place the machine where it must be installed, lower
the machine slowly till it touches the floor.
Figure 1 shows a way of carrying the machine. You can
use a crane with hook or a forklift for handling operation
.
Figure 1
Attention:
Lifting and carrying operations should be carried out by skilled workers,
such as truck operator, crane operator, etc. Also, it is necessary to keep in mind that
having large safety margins will provide you efficient working conditions and enable you
to take into consideration most of the precautions.
P = 400 Kg
.
Summary of Contents for PV 35
Page 12: ...12 Safety Area Figure 2 ...
Page 17: ...17 Figure 6 Figure 7 ...
Page 21: ...21 Part List ...
Page 23: ...23 13 0 ELECTRIC DIAGRAM ...
Page 24: ...24 ...
Page 25: ...25 ...