INDEX 

 

 

page 

 

Conformity declaration 

3-4 

1. 

Introduction 

2.  

Use of boiler 

3.  

Boiler construction description 

4. 

Technical data 

5. 

Fuel 

 

5.1 

Fuel 

5.2 

Alterntive fuel 

6. 

Boiler’s assembly guidelines 

 

6.1 

Requiremends for boiler-room 

6.2 

Boiler’s arragement 

6.3 

Connecting boiler to a chimney 

6.4 

Connecting boiler to a heating installation 

 

6.5 

Connecting boilers to electrical  installation 

7. 

Operation and installation guidelines 

 

7.1 

Filing with water 

7.2 

Boiler’s firing up 

10 

 

Table (technical – exploitation parameters) 

11-13 

 

Boiler’s construction scheme 

14 

 

7.3 

Burning 

15 

7.4 

Cleaning the boiler 

15 

7.5 

End of heating season 

15 

8. 

Terms of safe exploitation 

16 

9. 

States of important boiler’s functioning 

16 

10.  Protection means 

17 

11.  Terms of delivery 

18 

12.  Recycling 

18 

13.  Terms of warranty 

18 

 

Service repairs 

 21 

 

Warranty card 

22 

 

 

 

       

Summary of Contents for NWT

Page 1: ...L A R S K I 28 100 Busko Zdr j Owczary ul Przemys owa 3 Phone 48 41 378 46 19 Fax 48 41 370 83 10 TECHNICAL START UP DOCUMENTATION of water boiler s for heating installations SAS NWT type adopted for...

Page 2: ...r to a heating installation 8 6 5 Connecting boilers to electrical installation 9 7 Operation and installation guidelines 9 7 1 Filing with water 9 7 2 Boiler s firing up 10 Table technical exploitati...

Page 3: ...3...

Page 4: ...4...

Page 5: ...ler is 0 30 0 55 mbar depending on boiler s power These boilers may also work in hot water installations utilizing a heat exchanger Boiler s selection for building heating should be based on heat bala...

Page 6: ...neral wool which fill the space between the heat exchanger and boilers casing pos 1 Coal heating boilers of SAS NWT type are equipped with a controller and blow in fan Boilers work based on the proces...

Page 7: ...cal Start Up Documentation 6 1 REQUIREMENTS FOR BOILER ROOM The boiler room where the heating boiler for central heating installation shall be installed must conform the requirements of detailed regul...

Page 8: ...on detailed regulations being in force in the country of destination Assuming that it is not possible to achieve such parameters for chimney and chimney draught problems are experienced resulting in i...

Page 9: ...r temperature below 55 C then the boiler should be connected to the heating installation equipped with three or four pass valve protecting it against low temperature corrosion 6 5 CONNECTING BOILER TO...

Page 10: ...pieces of paper and wood Then thin layer of coal is applied Once a coal is glowing the ash box and furnace door must be closed Open fuel charge door and fill the combustion chamber with fuel reaching...

Page 11: ...g pressure bar 1 5 11 Maximal allowable working temp C 85 12 Recommended heating water working temp C 60 80 13 Minimal return water temp C 55 14 Power supply V Hz 15 Power consumption 16 Dimensions A...

Page 12: ...735 785 835 885 885 935 985 985 1035 H 1500 1560 1560 1560 1610 1635 1685 1735 1735 1780 1830 1830 1870 H1 1470 1530 1530 1530 1580 1605 C 1655 C 1705 C 1705 C 1750 C 1800 C 1800 C 1840 C H2 350 300 3...

Page 13: ...r jacket 8 glow prevention grid 13 smoke conduit cleaning hole 18 blowdown connection 23 temperature regulator controller 4 furnace chamber 9 water grates 14 smoke throttle 19 hot water connector pipe...

Page 14: ...tion connector pipe 3 water jacket 8 water grate 13 temperature sensor well 18 smoke conduit cleaning hole 23 blowdown connection 4 return water connector pipe 9 furnace chamber 14 hot water connector...

Page 15: ...troller keeps it constant If boiler s temperature is lower than set rotation speed of fan is increased if it is higher scavenges of the boiler are only performed 7 4 CLEANING THE BOILER In order to us...

Page 16: ...fire up a boiler by use of petrol kerosene solvents explosion may occur causing he operator to be burned in case of installation malfunction and lacking water in a boiler do not fill it in if boiler...

Page 17: ...r s start up and after each standby heat the boiler e g burn it up to 70 C and keep that temperature for several hours Hitting shooting in boiler air in the heating installation and boiler due to impr...

Page 18: ...ng a boiler to a heating installation make check if all boiler s components are in good working condition and that the boiler is fully equipped NOTE Boilers need to be transported in the vertical posi...

Page 19: ...lized by manufacturer is only possible based o expert opinion that repair is not workable 10 If the advertiser does not allow double warranty repairs despite the willingness of the guarantor to comply...

Page 20: ...tation shall be addressed ZAK AD METALOWO KOTLARSKI Owczary ul Przemys owa 3 28 100 Busko Zdr j Tel 4841 378 46 19 Fax 4841 370 83 10 http www sas busko pl e mail biuro sas busko pl serwis sas busko p...

Page 21: ...21 SERVICE REPAIRS...

Page 22: ...mperature boiler of SAS NWT type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stamp...

Reviews: