background image

 

12 

 

 No. 

Parameter 

Unit 

SAS NWT 

1. 

Boiler power    

kW 

52 

58 

62 

68 

72 

78 

90 

100 

110 

132 

150 

175 

200 

2. 

Boiler heated surface 

m

2

 

4.5 

5.0 

5.5 

6.0 

6.5 

7.0 

8.0 

9.0 

10.0 

12.0 

14.0 

16.0 

18.0 

3. 

Boiler efficiency 

79,4 ÷ 85,0 

4. 

Fuel consumpcion 

kg/h 

2,9 

3,6 

4,5 

5,0 

6,1 

7,2 

8,3 

9,2 

10,1 

12,3 

13,6 

15,1 

17,2 

5. 

Load chamber capacity 

dm

3

 

kg 

120 
~90 

170 

~130 

180 

~140 

200 

~150 

210 

~160 

240 

~180

 

270 

~200 

330 

~250 

350 

~260 

430 

~320 

500 

~380 

550 

~410 

630 

~470 

6. 

Exhaust temperature 

°C 

90 ÷ 270 

7. 

Boiler water capacity 

130 

160 

180 

210 

245 

265 

295 

345 

405 

465 

510 

580 

660 

8. 

Boiler weight (without water) 

kg 

630 

650 

670 

800 

840 

1050 

1270 

1450 

1550 

1770 

2120 

2370 

2470 

9. 

Required chimney draught 

mbar 

0,45 

0,55 

10. 

Maximal allowable opperating 
pressure   

bar 

1.5 

11. 

Max. allowable working temp. 

°C 

85 

12. 

Reccomended heating water 
working temp. 

°C 

60 ÷ 80 

13. 

Minimal return water temp. 

°C 

55 

14. 

Power supply 

V/Hz 

~230/50 

15. 

Power consumption 

to 375 

to 525 

16. 

D

im

e

ns

io

ns

 

mm 

1420 

1470 

1485 

1500 

1500 

1630 

1680 

1740 

1930 

2020 

2140 

2360 

2360 

A1 

1020 

1070 

1070 

1070 

1070 

1175 

1225 

1275 

1465 

1535 

1585 

1775 

1775 

725 

725 

755 

795 

795 

845 

895 

945 

945 

995 

1045 

1045 

1095 

B1 

665 

655 

695 

735 

735 

785 

835 

885 

885 

935 

985 

985 

1035 

1500 

1560 

1560 

1560 

1610 

1635 

1685 

1735 

1735 

1780 

1830 

1830 

1870 

H1 

1470 

1530 

1530 

1530 

1580 

1605+C* 

1655+C* 

1705+C* 

1705+C* 

1750+C* 

1800+C* 

1800+C* 

1840+C* 

H2 

350 

300 

300 

300 

300 

300 

300 

300 

300 

300 

300 

300 

300 

H3 

1190 

1210 

1210 

1210 

1240 

1240 

1280 

1310 

1310 

1330 

1360 

1360 

1400 

410 

460 

460 

460 

460 

510 

560 

600 

650 

690 

740 

790 

840 

560 

610 

610 

610 

670 

670 

670 

720 

720 

760 

780 

780 

860 

17. 

Smoke conduit dimensions 

mm x mm 

240x235 

255x245 

265x255 

285x255 

285x265 

295x290 

305x305 

305x315 

315x320 

335x340 

365x360 

385x380 

405x400 

18. 

Connector pipe diameter  
(supply/return) 

G 2½ or G 3 

Flange joint 

19. 

Load door opening 

mm x mm 

340x200 

340x200 

340x200 

340x200 

340x200 

340x200 

380x240 

380x240 

380x240 

380x240 

430x260 

430x260 

430x260 

20. 

Minimal chimney height

 

10 

11 

13 

15 

21. 

Required chimney dimensions

 

cm x cm 

25x25 

26x26 

26x26 

28x28 

28x28 

28x28 

30x30 

30x30 

30x30 

30x30 

32x32 

32x32 

32x32 

*     when working at average load (50% of rated power)/ rated load

 

**    if manufacturer recommendations regarding heating water temperature ranges are

 

not observed, boiler must be obligatory connected  to central heating system equipped with three- or four – ways 

valve, protecting against so called „ low temperatures corrosion” 

     C*  handle use to transport a boiler ( dimension 150 mm)

 

TECHNICAL AND OPERATION PARAMETERS OF SAS NWT BOILER

 

Summary of Contents for NWT

Page 1: ...L A R S K I 28 100 Busko Zdr j Owczary ul Przemys owa 3 Phone 48 41 378 46 19 Fax 48 41 370 83 10 TECHNICAL START UP DOCUMENTATION of water boiler s for heating installations SAS NWT type adopted for...

Page 2: ...r to a heating installation 8 6 5 Connecting boilers to electrical installation 9 7 Operation and installation guidelines 9 7 1 Filing with water 9 7 2 Boiler s firing up 10 Table technical exploitati...

Page 3: ...3...

Page 4: ...4...

Page 5: ...ler is 0 30 0 55 mbar depending on boiler s power These boilers may also work in hot water installations utilizing a heat exchanger Boiler s selection for building heating should be based on heat bala...

Page 6: ...neral wool which fill the space between the heat exchanger and boilers casing pos 1 Coal heating boilers of SAS NWT type are equipped with a controller and blow in fan Boilers work based on the proces...

Page 7: ...cal Start Up Documentation 6 1 REQUIREMENTS FOR BOILER ROOM The boiler room where the heating boiler for central heating installation shall be installed must conform the requirements of detailed regul...

Page 8: ...on detailed regulations being in force in the country of destination Assuming that it is not possible to achieve such parameters for chimney and chimney draught problems are experienced resulting in i...

Page 9: ...r temperature below 55 C then the boiler should be connected to the heating installation equipped with three or four pass valve protecting it against low temperature corrosion 6 5 CONNECTING BOILER TO...

Page 10: ...pieces of paper and wood Then thin layer of coal is applied Once a coal is glowing the ash box and furnace door must be closed Open fuel charge door and fill the combustion chamber with fuel reaching...

Page 11: ...g pressure bar 1 5 11 Maximal allowable working temp C 85 12 Recommended heating water working temp C 60 80 13 Minimal return water temp C 55 14 Power supply V Hz 15 Power consumption 16 Dimensions A...

Page 12: ...735 785 835 885 885 935 985 985 1035 H 1500 1560 1560 1560 1610 1635 1685 1735 1735 1780 1830 1830 1870 H1 1470 1530 1530 1530 1580 1605 C 1655 C 1705 C 1705 C 1750 C 1800 C 1800 C 1840 C H2 350 300 3...

Page 13: ...r jacket 8 glow prevention grid 13 smoke conduit cleaning hole 18 blowdown connection 23 temperature regulator controller 4 furnace chamber 9 water grates 14 smoke throttle 19 hot water connector pipe...

Page 14: ...tion connector pipe 3 water jacket 8 water grate 13 temperature sensor well 18 smoke conduit cleaning hole 23 blowdown connection 4 return water connector pipe 9 furnace chamber 14 hot water connector...

Page 15: ...troller keeps it constant If boiler s temperature is lower than set rotation speed of fan is increased if it is higher scavenges of the boiler are only performed 7 4 CLEANING THE BOILER In order to us...

Page 16: ...fire up a boiler by use of petrol kerosene solvents explosion may occur causing he operator to be burned in case of installation malfunction and lacking water in a boiler do not fill it in if boiler...

Page 17: ...r s start up and after each standby heat the boiler e g burn it up to 70 C and keep that temperature for several hours Hitting shooting in boiler air in the heating installation and boiler due to impr...

Page 18: ...ng a boiler to a heating installation make check if all boiler s components are in good working condition and that the boiler is fully equipped NOTE Boilers need to be transported in the vertical posi...

Page 19: ...lized by manufacturer is only possible based o expert opinion that repair is not workable 10 If the advertiser does not allow double warranty repairs despite the willingness of the guarantor to comply...

Page 20: ...tation shall be addressed ZAK AD METALOWO KOTLARSKI Owczary ul Przemys owa 3 28 100 Busko Zdr j Tel 4841 378 46 19 Fax 4841 370 83 10 http www sas busko pl e mail biuro sas busko pl serwis sas busko p...

Page 21: ...21 SERVICE REPAIRS...

Page 22: ...mperature boiler of SAS NWT type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stamp...

Reviews: