5.2.

 

 ALTERNATIVE FUEL 

 
The alternative fuel for coal heating boilers of  SAS  NWT type is a mixture of the black coal 
grades as follows:  70% of coal the nut grade (  class 24/12  acc. to  above mentioned norm)  
and  30%   of  coal  the fine  coal  grade (class  21/15  acc. to above mentioned norm). These 
boilers are also fit fir combusting long flame fuels, such as: brown coal and wood in different 
forms, e.g. chips, silver, shavings, etc. 
 
The  wood  has  to  be  seasoned  at  least  one  year!    Wet  wood  combustion  lowers  the 
efficiency  and  the  lifetime  of  a  boiler.    It  also  obstructs  the  declared  power  for  slow 
combustion  sustainment.  For  this  type  of  boiler  it  is  not  recommended  to  relay  only  on  the 
fine coal. 
 
 
 
 

 

 

Boiler’s    assembling  should  be    performed        by  qualified    and  authorized    personnel    
(qualified  person    upon  adequate  training  and  authorized  for  performing  maintenance  and 
repair works).  
The    fitter’s    obligation    is    to    get    familiar    with    the    product,        its    functioning    and  
protection  systems functionality. 

 

Prior  to    boiler’s  assembling    it    is  strictly  necessary    to  get  familiarized    with  the 
content  of  hereby 

Technical-Start-Up Documentation. 

 
6.1.

 

REQUIREMENTS FOR BOILER-ROOM 

 
The boiler room,  where  the  heating  boiler  for central heating  installation  shall  be  
installed,  must  conform 

the  requirements  of  detailed  regulations  being  in  force,  at  the  

country  of  destination  (e.g.  PN-87/B-02411).  
In particular, the following requirements shall be fulfilled: 

 

the  boiler  rooms  should  be  located  as  centrally  as  possible  to  rooms  which  are  

covered    with    heating  system,    and  the  boiler  itself  should  be  placed  as  close  as 
possible to  chimney  (chimneys), 

 

boiler room entrance door should be opened on the outside, and  be made of 

inflammable materials, 

 

the  boiler  room  should  have  air  blow-in  ventilation,  a  channel    with  section  no  

less  than  50%    of  the   chimney  section,   but not  less than   21 x 21   cm,   with 
the exit at the back part  boiler’s room ,  (lack of such ventilation or obstruction may 
cause:  smoking,  inability to get higher temperature), 

 

the boiler room  should  have  air blow-out  ventilation under room’s  ceiling with  

section  no less  than  25%  of  the  chimney  section,  but  not  less  than    14 x 14  cm    
(the  purpose  of  this  system  is to carry out harmful gases). 

 
NOTE:   Employing of  mechanical blow-out ventilation is  unacceptable. 
 
The boiler room should be provided with day and artificial lighting. 

6. BOILER’S ASSEMBLY GUIDELINES

 

Summary of Contents for NWT

Page 1: ...L A R S K I 28 100 Busko Zdr j Owczary ul Przemys owa 3 Phone 48 41 378 46 19 Fax 48 41 370 83 10 TECHNICAL START UP DOCUMENTATION of water boiler s for heating installations SAS NWT type adopted for...

Page 2: ...r to a heating installation 8 6 5 Connecting boilers to electrical installation 9 7 Operation and installation guidelines 9 7 1 Filing with water 9 7 2 Boiler s firing up 10 Table technical exploitati...

Page 3: ...3...

Page 4: ...4...

Page 5: ...ler is 0 30 0 55 mbar depending on boiler s power These boilers may also work in hot water installations utilizing a heat exchanger Boiler s selection for building heating should be based on heat bala...

Page 6: ...neral wool which fill the space between the heat exchanger and boilers casing pos 1 Coal heating boilers of SAS NWT type are equipped with a controller and blow in fan Boilers work based on the proces...

Page 7: ...cal Start Up Documentation 6 1 REQUIREMENTS FOR BOILER ROOM The boiler room where the heating boiler for central heating installation shall be installed must conform the requirements of detailed regul...

Page 8: ...on detailed regulations being in force in the country of destination Assuming that it is not possible to achieve such parameters for chimney and chimney draught problems are experienced resulting in i...

Page 9: ...r temperature below 55 C then the boiler should be connected to the heating installation equipped with three or four pass valve protecting it against low temperature corrosion 6 5 CONNECTING BOILER TO...

Page 10: ...pieces of paper and wood Then thin layer of coal is applied Once a coal is glowing the ash box and furnace door must be closed Open fuel charge door and fill the combustion chamber with fuel reaching...

Page 11: ...g pressure bar 1 5 11 Maximal allowable working temp C 85 12 Recommended heating water working temp C 60 80 13 Minimal return water temp C 55 14 Power supply V Hz 15 Power consumption 16 Dimensions A...

Page 12: ...735 785 835 885 885 935 985 985 1035 H 1500 1560 1560 1560 1610 1635 1685 1735 1735 1780 1830 1830 1870 H1 1470 1530 1530 1530 1580 1605 C 1655 C 1705 C 1705 C 1750 C 1800 C 1800 C 1840 C H2 350 300 3...

Page 13: ...r jacket 8 glow prevention grid 13 smoke conduit cleaning hole 18 blowdown connection 23 temperature regulator controller 4 furnace chamber 9 water grates 14 smoke throttle 19 hot water connector pipe...

Page 14: ...tion connector pipe 3 water jacket 8 water grate 13 temperature sensor well 18 smoke conduit cleaning hole 23 blowdown connection 4 return water connector pipe 9 furnace chamber 14 hot water connector...

Page 15: ...troller keeps it constant If boiler s temperature is lower than set rotation speed of fan is increased if it is higher scavenges of the boiler are only performed 7 4 CLEANING THE BOILER In order to us...

Page 16: ...fire up a boiler by use of petrol kerosene solvents explosion may occur causing he operator to be burned in case of installation malfunction and lacking water in a boiler do not fill it in if boiler...

Page 17: ...r s start up and after each standby heat the boiler e g burn it up to 70 C and keep that temperature for several hours Hitting shooting in boiler air in the heating installation and boiler due to impr...

Page 18: ...ng a boiler to a heating installation make check if all boiler s components are in good working condition and that the boiler is fully equipped NOTE Boilers need to be transported in the vertical posi...

Page 19: ...lized by manufacturer is only possible based o expert opinion that repair is not workable 10 If the advertiser does not allow double warranty repairs despite the willingness of the guarantor to comply...

Page 20: ...tation shall be addressed ZAK AD METALOWO KOTLARSKI Owczary ul Przemys owa 3 28 100 Busko Zdr j Tel 4841 378 46 19 Fax 4841 370 83 10 http www sas busko pl e mail biuro sas busko pl serwis sas busko p...

Page 21: ...21 SERVICE REPAIRS...

Page 22: ...mperature boiler of SAS NWT type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stamp...

Reviews: