background image

 

 

Volume  of  pressure  vessel  should  be  equal  at  least  4%  volume  o  water  in  the  entire  heating 
installation. 
 
NOTE:  Ascending    and  descending  safety  pipe  as  well  as  circulation  pipe  must  not  be 
equipped  with  any  valves.  In  addition,  those  pipes  and  the  pressure  vessel  should  be 
protected against freezing.  

In    the    front    upper    part    of    insulation    there  is  G      1”  connector    for    thermometer.    If  
thermometer    will    not  be  mounted  on  it,  this  connector  should  be  plugged.  Boilers  of    SAS  
NWT  type may work with gravitational or forced water circulation. If installation is provided 
with  circulation  pump,  than  on  feeding/return  pipe  the  differential  valve  should  be  installed. 
When  blackout  or  pump  malfunction  occurs,  this  valve  will  open    and  the  system  start  work 
running by gravitation.  

NOTE: It is recommended to connect the boiler to heating system provided with three- 
or four-pass valve. The main advantage of such connection is boiler protection function 
against low temperature corrosion, preventing it from premature wear. 

If    not    satisfactory    to    comply    with    manufacturer’s    recommendations    in    reference    to  
maintaining    given  heating  water  temperature    ranges    occurs    (table    TECHNICAL    –  
EXPLOATATION PARAMETERS  p.  11-12,   point  12, 13  it  concerns  in particular long-
lasting  return  water  temperature  below   55°C),  then  the boiler should be connected to the 
heating  installation  equipped  with    three-  or  four-pass  valve  protecting  it  against  low 
temperature corrosion. 
 

6.5.

 

CONNECTING BOILER TO ELECTRICAL INSTALLATION   

 

Boiler    room    should    be    equipped    with    electrical    installation    230V/50Hz    should    be    
according  to  detailed regulations being in force in the country of destination. 

 

Electric  socked  should  be  earthed.  Grounding  functionality  should  be  checked.    Cable  
extensions    are  forbidden.  Faulty  installation  may  cause  the  controller  to  be  destroyed    or  be 
unsafe for the user.  Controller and    other  cooperating  devices  are  powered  with  230 V,    
therefore  all  connections  shell  be  made  by qualified personnel (certified electrician). 
 
NOTE:  Electrical  cables  of  powered  devices  should  be  placed  away  from  boiler’s  
parts,    which  tend    to    be    hot    during    exploitation    of    boiler    (  cover    of    the    upper  
washout  hole,  smoke conduit, door). 

 

 
 

 
 

 

7.1.

 

 FILING WITH WATER

 

 

Boiler and the entire installation water filling is to be performed using blowdown connection. 
This    activity    should    be    performed    slowly    allowing    the    air      residing    in    the  
installation  to  be removed. 
It is accomplished when water  is going out of  overflow pipe. 
When  filling  the    heating  system  installation    with    water    it    is    recommended    to    loose  
screw    connection    at  the    place    of    boiler    –    installation  assembly  (on  the  hot  water 
connector).  Once water is flowing out, tight the connection.  

7. OPERATION AND EXPLOITATION GUIDELINES

 

Summary of Contents for NWT

Page 1: ...L A R S K I 28 100 Busko Zdr j Owczary ul Przemys owa 3 Phone 48 41 378 46 19 Fax 48 41 370 83 10 TECHNICAL START UP DOCUMENTATION of water boiler s for heating installations SAS NWT type adopted for...

Page 2: ...r to a heating installation 8 6 5 Connecting boilers to electrical installation 9 7 Operation and installation guidelines 9 7 1 Filing with water 9 7 2 Boiler s firing up 10 Table technical exploitati...

Page 3: ...3...

Page 4: ...4...

Page 5: ...ler is 0 30 0 55 mbar depending on boiler s power These boilers may also work in hot water installations utilizing a heat exchanger Boiler s selection for building heating should be based on heat bala...

Page 6: ...neral wool which fill the space between the heat exchanger and boilers casing pos 1 Coal heating boilers of SAS NWT type are equipped with a controller and blow in fan Boilers work based on the proces...

Page 7: ...cal Start Up Documentation 6 1 REQUIREMENTS FOR BOILER ROOM The boiler room where the heating boiler for central heating installation shall be installed must conform the requirements of detailed regul...

Page 8: ...on detailed regulations being in force in the country of destination Assuming that it is not possible to achieve such parameters for chimney and chimney draught problems are experienced resulting in i...

Page 9: ...r temperature below 55 C then the boiler should be connected to the heating installation equipped with three or four pass valve protecting it against low temperature corrosion 6 5 CONNECTING BOILER TO...

Page 10: ...pieces of paper and wood Then thin layer of coal is applied Once a coal is glowing the ash box and furnace door must be closed Open fuel charge door and fill the combustion chamber with fuel reaching...

Page 11: ...g pressure bar 1 5 11 Maximal allowable working temp C 85 12 Recommended heating water working temp C 60 80 13 Minimal return water temp C 55 14 Power supply V Hz 15 Power consumption 16 Dimensions A...

Page 12: ...735 785 835 885 885 935 985 985 1035 H 1500 1560 1560 1560 1610 1635 1685 1735 1735 1780 1830 1830 1870 H1 1470 1530 1530 1530 1580 1605 C 1655 C 1705 C 1705 C 1750 C 1800 C 1800 C 1840 C H2 350 300 3...

Page 13: ...r jacket 8 glow prevention grid 13 smoke conduit cleaning hole 18 blowdown connection 23 temperature regulator controller 4 furnace chamber 9 water grates 14 smoke throttle 19 hot water connector pipe...

Page 14: ...tion connector pipe 3 water jacket 8 water grate 13 temperature sensor well 18 smoke conduit cleaning hole 23 blowdown connection 4 return water connector pipe 9 furnace chamber 14 hot water connector...

Page 15: ...troller keeps it constant If boiler s temperature is lower than set rotation speed of fan is increased if it is higher scavenges of the boiler are only performed 7 4 CLEANING THE BOILER In order to us...

Page 16: ...fire up a boiler by use of petrol kerosene solvents explosion may occur causing he operator to be burned in case of installation malfunction and lacking water in a boiler do not fill it in if boiler...

Page 17: ...r s start up and after each standby heat the boiler e g burn it up to 70 C and keep that temperature for several hours Hitting shooting in boiler air in the heating installation and boiler due to impr...

Page 18: ...ng a boiler to a heating installation make check if all boiler s components are in good working condition and that the boiler is fully equipped NOTE Boilers need to be transported in the vertical posi...

Page 19: ...lized by manufacturer is only possible based o expert opinion that repair is not workable 10 If the advertiser does not allow double warranty repairs despite the willingness of the guarantor to comply...

Page 20: ...tation shall be addressed ZAK AD METALOWO KOTLARSKI Owczary ul Przemys owa 3 28 100 Busko Zdr j Tel 4841 378 46 19 Fax 4841 370 83 10 http www sas busko pl e mail biuro sas busko pl serwis sas busko p...

Page 21: ...21 SERVICE REPAIRS...

Page 22: ...mperature boiler of SAS NWT type installed and operated in pursuance of Technical Start Up Documentation Boiler no Heating capacity Heated surface Year of manufacture Manufacturer signature and stamp...

Reviews: