On the 20 m² cartridges the permeate manifold is divided into an upper and a lower manifold.
These are joined to a 12 mm drain line via a Y-piece, or joined in a stainless steel manifold
with push-fit fittings when used for the 40 and 80 m² units.
The 40 and 80 m² units may also include liquid manifolds for the feed and retentate lines.
These are to be connected by flexible hoses to the feed / retentate system.
Below are shown two examples of this but the solution may vary depending on the
application and other specific requirements. It is also an option to connect flexible hoses
directly to and from the 20 m² cartridges.
Feed manifold for 40 / 80 m² units Retentate manifold for 40 / 80 m² units