
KBox E-410-APL - User Guide, Rev. 1.0
// 33
7.1.
System Mounting
In order to adapt the KBox E-410-APL for mounting Kontron offers different mounting solution such as:
KBox E-410-APL configuration with a DIN rail mounting kit for vertical or horizontal installation into a control
cabinet / custom enclosure / machine
KBox E-410-APL configuration with a VESA mounting kit for horizontal installation into a control cabinet / custom
enclosure / machine or onto a wall / the back of a monitor
KBox E-410-APL as desktop unit
7.1.1.
DIN Rail Mounting
Depending on the ordered KBox E-410-APL configuration, your system may be supplied with a DIN rail mounting kit
(Figure 7).
Figure 7: Optional DIN rail mounting kit
1
DIN Rail Clamp
2
DIN Rail Spring
3
Mounting Hole
4 M3 x 4 mm Screw
To mount the KBox E-410-APL please proceed according to the steps described:
1.
Secure the DIN rail clamp on the rear side of the chassis with the supplied screws (M3 x 4 mm).
Figure 8: Securing the DIN rail clamp (Vertical Installation)
1
2
3
3
3
4
4
4