76
S&C Instruction Sheet 461-509
Quick Installation Checklist
Pre-Installation
□
Examine the shipment(s) and make sure it includes:
• The communication gateway
• Mounting hardware for securing the gateway to the pole
• An ac power cable
• Make sure the device uses firmware v1.6 or later for
Extended Open Interval
functionality.
□
Always read the Danger and Warning labels.
□
Follow your company’s PPE guidelines and standard operating procedures.
Installation
□
For the communication gateway, verify that:
• The field-area-network radio is configured, installed, and connected
• The communication gateway is mounted securely on the pole
• The communication gateway is grounded
• The ac power cable is connected and control power is available
• The remote antenna (if applicable) is installed and connected
• The communication gateway is locked for security, when configured and operational
□
For the TripSaver II reclosers, verify that:
• The device is set to
Gateway
mode
• The units are powered up
After the above steps are complete, proceed with the following if they have not already
been done:
□
Pair the communication gateway with TripSaver II device(s).
□
Configure the communication gateway. To configure the communication gateway in the
warehouse, use the three-prong ac power cable (cat. number 007-002101-01/02).