
627-500 30
Step 3
Move the new module into place immediately adjacent
to the existing end module. Complete all bus and cable
connections and other operations described in Steps 9
through 36, on pages 13 through 28.
Step 4
Perform the precautionary checks listed under “Before
Walking Away” on page 28.
Step 5
Following the procedures outline in the “WARNING” on
page 29, make certain all temporary grounds have been
removed before re-energizing the switchgear.
ADDITIONS TO EXISTING PMX ASSEMBLIES