3-11
3. Disassembly and Reassembly
3-4. Spin - Nut Repairing Box
1 SHAFT
2 SPIN NUT
3 JIG
5 CONNECTING ROD
4 GUIDE
PIN
6 HANDLE
Ź
Procedure
1. Insert the jig
噾
into the spin-nut
噽
.
2. Insert the guide pin
噿
LQWRWKHJURRYHRIWKHÀDQJHVKDIWE\URWDWLQJLWWRWKHULJKWDQGOHIW
Guide Pin
Inserting Point
FLANGE
SHAFT
SPIN
BASKET
3. Insert the connecting rod
嚀
and handle
嚁
LQWRWKHVTXDUHER[7KHQWXUQWKHKDQGOHFORFNZLVHRQ
WKHD[LVRIWKHVPDOOER[WRGLVDVVHPEOH5LJKWKDQGWKUHDG
LOCK
LOOSEN
7RGLVDVVHPEOHWKHER[JLYHWKUHHWRIRXUWLPHVRILQVWDQWDQHRXVVKRFNVWRWKHKDQGOHLQWKHORRVHQLQJGLUHFWLRQ
then disassemble it by turning the handle when the nut is loosened.
7RGLVDVVHPEOHWKHER[VWULNHWKHKDQGOHWKUHHRUIRXUWLPHVTXLFNVKRFNVWRORRVHQLWWKHQFRPSOHWHWKHGLVDV
-
sembly by turning the handle as the nut is loosened.
5. Reassemble in reverse order.
Summary of Contents for WA10VP
Page 25: ...3 12 3 Disassembly and Reassembly Memo ...
Page 27: ...5 2 SORGHG 9LHZV DQG 3DUWV LVW 5 1 MAIN BEST P0001 U0084 F0062 ...
Page 31: ...5 6 5 3 ASSY TUB 262 9 4 ...
Page 38: ...6 4 6 PCB Diagram Memo ...
Page 40: ...7 2 UG Gk Mome ...
Page 41: ...8 1 _UGz Gk 1 Vfkhpdwlf Gldjudp 041 PDLQ FRQWURO G Gk G G G G G Gz G U ...
Page 42: ...8 2 _UGz Gk 051 VXE FRQWURO G Gk G G G G G Gz G U ...