Samsung Electronics
5. C Frame Installation
42
• Adjust Z-leveling between modules.
2. Move Module 2.0mm
3. Insert Gap-Tool
Turn Gap-Tool 90degree
4. Insert Adjusment-Tool
Turn Holder Magnet
5. Hold Module by Hand
Turn Gap-Tool 90degree, Remove Gap-Tool
Check Flatness, Repeat process if needed
2.0mm
~2mm
90
°
1. Attach Suction-Pad
+
: counter clockwise -> module move forward
- : clockwise -> module move backward
Turn Holder 360
°
-> Module move 1.0mm
Un-Lock
Lock
+
-
+
-
90
°