Samsung Electronics
5. C Frame Installation
①
After installing Frame and I/G, install cabinets on the bottom line first
.
※
Cabinet installation should be performed from the bottom to the top, left end → right end or right end → left end direction. (Fig.1)
②
Adjust the Corners of the Cabinet to each of the cravings to be closer to the Frame.
(Fig.2)
③
Press the upper side of the Frame and assemble so that it slides towards downward.
(Fig.3)
◇
Cabinet Installation
36
Fig.1 Installation sequence of the Cabinet
Sliding Screw
Fig.2 Adjust the corners to guide line
Guide line
Guide line
Fig.3 Sliding cabinet to Frame
8
7
6
5
16
15
14
13
24
23
22
21
32
31
30
29
40
39
38
37
4
12
21
28
36
48
47
46
45
44
3
11
19
43
27
35
56
55
54
53
52
64
63
62
61
60
59
51
2
10
18
26
34
42
1
9
17
41
25
33
50
58
57
49