Samsung Electronics
5. C Frame Installation
Install I/G first on the back side of the Cabinet of each Type
.
(Fig.1)
※
Installation location: Align the I / G to the point below 50 ~ 55mm on the right frame and fasten the screws. (Fig.2)
※
In the future service, I / G must be able to be released through the cabinet and must be installed in the corresponding location.
※
Depending on the screen size, I / G can be placed outside the screen for convenience of work.
50~55mm
I/G
• Fix I/G Location
Fig1. Location to Fix the I/G and Order of OCM cable
Fig2. Location to Fix I/G
120~125mm
35
2x2 : FHD IW008J
3x3 : FHD IW012J
4x4 : FHD IW016J