CHAPTER 1. Before Installation
1-8
© SAMSUNG Electronics Co., Ltd.
1.4 Pre-survey
Before starting the construction, the constructor and the departments concerned with the
construction inspect the following items with a pre-survey checklist for the smooth
progress of the construction. If any insufficiencies or problems are found, make the plan
upon deliberation with the departments.
Installation/construction personnel and the service provider carry out the site survey for the
system installation focusing on the following items:
Examination about the conformance and the economical efficiency of the place that
the system is transported or installed.
Status of external interfaces
Power capacity and wiring status
Possibility of system extension
Review if the place has the enough space to operate and maintain.
Summary of Contents for RRH-2WB
Page 1: ...Ver 2600 00ETB9GAA 2 0 Mobile WiMAX TD LTE RRH 2WB Installation Manual ...
Page 6: ...INTRODUCTION IV SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Page 12: ...SAFETY CONCERNS X SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Page 138: ...ANNEX F Standard Torque F 2 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...