Table 3.10 Construction Situation Checklist (Continued)
Category
Check Items
Criteria
Result
Remarks
Pass Fail
Ground
Construction
Ground line standard
Visual inspection
Ground bar
↔
System
Visual inspection
Ground line cabling status
Cabling status check
Termination treatment of the
ground line (pressure
terminal)
Visual inspection
Feeder Line
Status
Feeder line cabling and
locking status
Beauty, robustness and
Bending
ANT installation and
attachment status
Visual inspection
(ANT bar’s vibration
status)
Connection and finish status
Beauty and robustness
Various
TAG Status
Feeder tag
Visual inspection
(Information mentioned:
length, loss value,
location)
Power cable tag
Visual inspection
(Power Identification)
Ground table tag
Visual inspection
Attachment status of the
label for the real-name
construction system
- Indoor: wall side of the gate
side
- Outdoor: inside of the
cover of the distribution box
Visual inspection
(size and material)
Finish
Status
Cable duct bolt’s attachment
status
Visual inspection
Feeder inlet finish treatment
status
Visual inspection (check
if the rear part is
attached)
Status of inside/outside of
the system and vicinity of the
base station
Visual inspection
General
Opinion
Summary of Contents for RRH-2WB
Page 1: ...Ver 2600 00ETB9GAA 2 0 Mobile WiMAX TD LTE RRH 2WB Installation Manual ...
Page 6: ...INTRODUCTION IV SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Page 12: ...SAFETY CONCERNS X SAMSUNG Electronics Co Ltd This page is intentionally left blank ...
Page 138: ...ANNEX F Standard Torque F 2 SAMSUNG Electronics Co Ltd This page is intentionally left blank ...