SAMSUNG Proprietary-Contents may change without notice
7. Level 2 Repair
7-8
This Document can not be used without Samsung's authorization
2) Beware that you do not damage PBA
2) Beware that you do not damage FPCB
1) Be careful not to make scratch and molding damage!
1) Be careful not to make scratch and molding damage!
15
1) Assemble REAR from upper earjack part
2) After slide open, press and assemble
keypad side
1) Assemble REAR screw 4point
16
13
1) Place PBA correct location on FRONT
1) Assemble slide FPCB connector to PBA
14
1
2
- Screw Size : M1.4 * L3.0 (6001-001811)
- Torque : 1.0 ~ 1.2 Kgf·cm