101
ENGLISH
❇
Before running the Auto pipe pairing operation, be sure to close the front cabinet. If this operation is run with the
front cabinet open, the product may be damaged and the pipe addresses cannot be correctly recognized.
To run the Auto pipe pairing operation, take the following steps:
1. Press the K2 button 13 times on the main PBA of the outdoor unit to start the Auto pipe pairing operation. (Display :
.)
Outdoor temperature < °
C
24
ºC
≤ Outdoor temperature < 30°
C
30°
C
≤ Outdoor temperature
Indoor temperature
< 24
°
C
Main heating operation
Main heating operation
Main cooling operation
Indoor temperature
≥ 24
°
C
Main heating operation
Main cooling operation
Main cooling operation
Each step is indicated on the outdoor unit display. (The whole operation takes about 25 to 55minutes normally,
depending on the number of indoor units connected. However, it can be operated for up to 2 hours to protect the
compressor.)
- Step 1 (Start
)
´
Steps 2 to 8 (Setup
)
´
Step 9 (Check
)
´
Step 10 (Confirmation
)
Summary of Contents for DVM S AM080FXVAGH
Page 112: ......