33
English
Extr
a pr
oc
edur
es
3
Tighten the cap securely.
Outer Diameter
[inch (mm)]
Tightening torque
Body cap
[(lbf·ft (Nꞏm)]
Charging port cap
[(lbf·ft (Nꞏm)]
Φ1/4 (Ø 6.35)
14.8 to 18.4
(20 to 25)
7.4 to 8.9
(10 to 12)
Φ3/8 (Ø 9.52)
Φ1/2 (Ø 12.70)
18.4 to 22.1
(25 to 30)
Φ5/8 (Ø 15.88)
22.1 to 25.8
(30 to 35)
NOTE
• Do not apply excessive force to the stop valve and
always use special instruments. Otherwise, the
stopping box can be damaged and the back sheet can
leaks.
• If the watertight sheet leaks, turn the axis back by
half, tighten the stopping box, then check the leakage
again. If there is no leakage any more, tighten the axis
entirely.
Closing the stop valve
1
Remove the cap.
2
Turn the stop valve clockwise by using a hexagonal
wrench.
3
Tighten the axis until the valve reached the sealing
point.
4
Tighten the cap securely.
CAUTION
• When you use the service port, always use a charging
hose, too.
• Check the leakage of refrigerant gas after tightening
the cap.
• Must use a spanner and wrench when you open/
tighten the stop valve.
DB68-12535A-00_IM_23Y FJM Outdoor_AA_EN_.indd 33
DB68-12535A-00_IM_23Y FJM Outdoor_AA_EN_.indd 33
2023-09-22 오후 1:46:59
2023-09-22 오후 1:46:59