![Samson SAM HOME Mounting And Operating Instructions Download Page 23](http://html1.mh-extra.com/html/samson/sam-home/sam-home_mounting-and-operating-instructions_3763784023.webp)
EB 5660 EN
5-3
Installation
Rail mounting
1. Fasten the spring-loaded hook at the bottom of the top hat rail.
2. Slightly push the gateway upwards and pull the top hooks over the top hat rail.
3. Undo the screws on the front cover.
4. Separate the gateway from the base.
5. Connect the wiring at the base as described in the 'Electrical connection' section.
6. Place the gateway onto the base.
7. Fasten the screws on the front cover.
Wall mounting
1. Undo the screws on the front cover.
2. Separate the gateway from the base.
3.
If necessary, drill holes with the specified dimensions in the appropriate places (see
Fig. 5-1). Fasten the base with four screws.
4. Connect the wiring at the base as described in the 'Electrical connection' section.
5. Place the gateway onto the base.
6. Fasten the screws on the front cover.
Summary of Contents for SAM HOME
Page 8: ...1 4 EB 5660 EN...
Page 28: ...5 8 EB 5660 EN...
Page 56: ...7 24 EB 5660 EN...
Page 58: ...8 2 EB 5660 EN...
Page 61: ...EB 5660 EN 9 3...
Page 62: ...9 4 EB 5660 EN...
Page 64: ...10 2 EB 5660 EN...
Page 66: ...11 2 EB 5660 EN...
Page 68: ...12 2 EB 5660 EN...
Page 70: ...13 2 EB 5660 EN...
Page 72: ...14 2 EB 5660 EN...
Page 77: ...EB 5660 EN 16 3 Annex Default password User Admin Password Kundendienst...
Page 78: ...16 4 EB 5660 EN...
Page 79: ......
Page 80: ......
Page 81: ......