EB 2540 EN
3-3
Design and principle of operation
3.1
Additional fittings
Î
See Fig. 3-2
Pressure gauges
Install a pressure gauge (3) at suitable points
to monitor the pressures prevailing in the
storage tank.
Shut-off valves
We recommend installing a shut-off valve (1)
both upstream of the strainer.
Strainers
We recommend installing a SAMSON
strainer (2) upstream of the input pressure
regulator. It prevents solid particles in the
process medium from damaging the regula-
tor.
Î
Do not use the strainer to permanently
filter the process medium.
Î
Select a strainer (mesh size) suitable for
the process medium.
Any impurities carried along by the process
medium may impair the proper functioning
of the regulator. We recommend installing a
strainer (e.g. SAMSON Type 2 NI) upstream
of the input pressure regulator (
u
EB 1015).
Information
4.3
4.4
4
3
1
2
4.1
4.2
Tank
1
Shut-off valve
2
Strainers
3
Pressure gauge (storage tank)
4
Type 2404-2 Excess Pressure Valve
4.1 Input pressure regulator
4.2
Pilot valve
4.3 Main valve with actuator (when mounted)
4.4 Needle valve (lead-sealed setting)
Fig. 3-2:
Type 2404-2 (installation example)
Summary of Contents for 2404-2
Page 12: ...1 8 EB 2540 EN Safety instructions and measures...
Page 18: ...2 6 EB 2540 EN Markings on the device...
Page 34: ...3 16 EB 2540 EN Design and principle of operation...
Page 60: ...11 2 EB 2540 EN...
Page 62: ...12 2 EB 2540 EN...
Page 64: ...13 2 EB 2540 EN...
Page 72: ...14 8 EB 2540 EN...
Page 75: ......