8. Checking of connections
Check the screw and pipe connections visually.
N
ote
!
During the first operating month the tightness of the screw connections in the crane,
shafts and joint shall be checked daily.
It is important to tighten the screw connections to the correct torque. The required wrench
sizes and torques:
Screw size
Wrench size
(mm)
Tightening torque for screws
of 8.8 strength class (Nm)
M 6
10
11
M 8
13
25
M 10
17
47
M 12
19
78
M 14
22
120
M 16
24
180
M 20
30
335
N
ote
!
Tightening torques for wheel fixing screws 540 Nm
5. Cleaning of radiator grilles
Depending on the operating environment,
the radiator grilles shall be cleaned often
enough to prevent the engine from over-
heating. Clean the rear cog screen and the
removable grille using compressed air or a
brush (fig. 29). When necessary, clean the
oil, engine and air conditioner condensers.
Note! The rear cog and the grilles must not
be covered with the engine running.
6. Checking of tyre air pressure
Check the tyre air pressure and external
condition visually. Use manometer if neces-
sary. The correct air pressure for the 500/60-
26.5 tyres is 3.7 bar, the 600/55-26.5 tyres
4.0 bar, the 540/65R28 tyres 3.2 bar.
Do not exceed the indicated pressures.
7. Checking for leakage
Check for any liquid, fluid and oil leakage.
Summary of Contents for HR46
Page 2: ......
Page 14: ... 14 Certificate on conformity to the EU directives ...
Page 29: ... 29 13a ...
Page 71: ... 71 Electric diagram ...
Page 72: ... 72 ...
Page 73: ... 73 ...
Page 74: ... 74 ...
Page 75: ... 75 ...
Page 76: ... 76 ...
Page 77: ... 77 ...
Page 78: ... 78 ...
Page 79: ... 79 ...
Page 80: ... 80 ...
Page 81: ... 81 ...
Page 82: ... 82 ...
Page 83: ... 83 ...
Page 84: ... 84 ...
Page 85: ... 85 ...
Page 86: ... 86 ...
Page 87: ... 87 ...
Page 88: ... 88 ...
Page 89: ... 89 ...
Page 90: ... 90 ...
Page 91: ... 91 ...
Page 92: ... 92 ...
Page 93: ... 93 ...
Page 94: ... 94 ...