VERTICAL PUMP
RDV - RGV - RCV
RBV - RNV - REV
EN-48
11.
SHIPPING TO SUPPLIER
Before returning the pump to the supplier, follow the steps below:
STEP
ACTION
1
Perform the steps indicated in the chapter "DISASSEMBLY AND REASSEMBLY".
2
It is mandatory to send a signed declaration that reclamation of the pump has taken place.
The customer is responsible for any damage to property or persons due to residues not removed.
It is also mandatory to indicate the possible presence of residual risks and the appropriate precautions to
be taken in carrying out maintenance.
3
Pack the pump properly and correctly.