VERTICAL PUMP
RDV - RGV - RCV
RBV - RNV - REV
EN-22
STEP
ACTION
2
Connect the belts / straps to the hook of a crane or gantry.
3
Slowly lift the load completely out from the package and check it is stable, making sure that the centre of
gravity of the pump is positioned in the centre of the lifting hook.
Make sure that the pump is always properly balanced and in a horizontal position.
MACHINERY
PARTLY COMPLETED MACHINERY
MACHINERY
PARTLY COMPLETED MACHINERY