21
7) Close the wind-proof cover, automatic splicing starts, visual inspection on
screen while splicing.
Attention: please don’t slide the fiber along the V-groove. The cleaving section should surpass
the V-groove but not exceed the mid of both electrodes.
8) Remove the spliced fiber, into the heater tanker; make sure the splicing position
in the center of the heat shrinkable sleeve. Heating automatically starts after
closing the heater cover.