“
A
SSEMBLY
I
NSTRUCTIONS
”
S
TEP
20
–
Upper
Handlebar (73)
Assembly
a. Refer above, 4pcs
Screws,
Philips Pan Head
(M5xp0.8x15mm)(132)
have preassembled on the
Back Swing Arm (81, 82)
.
b. Remove the above
Bolts (132)
.
c. There is a “
R
” & “
L
” decal on the
Upper
Handlebar (72, 73)
.
d. Attach the
Right Upper Handlebar (73)
to the
Right Back Swing Arm (82)
and fully tighten with
6pcs
Bolts, Hex Head Flange (151)
.
e. Refer to right, attach the
Front & Back Upper
Handlebar Cover (162, 163)
and fully tighten with
2pcs
Screws, Phillips Pan Head
(M6xp1.0x15mm) (132)
.
f. Repeat the above same procedure for the left
side.
NOTE:
**For the final step, make sure all the bolts and nuts are fully tightened before using the item. **
**Check whether the levelers are even on the floor (if the levelers are not even will produce noise), if not
,
review
the LEVELING NOTE. **
Summary of Contents for TOTAL MOTION
Page 44: ...PRODUCT PARTS DRAWING A...
Page 45: ...PRODUCT PARTS DRAWING B...
Page 46: ...PRODUCT PARTS DRAWING C...
Page 47: ......