3. PERIODIC MAINTENANCE
– 76 –
3.1.1 Lifting the machine on a hoist
WARNING
• Get qualified personnel to lift and lower the
machine on a hoist.
• Use sturdy wire ropes.
• Lock articulation by means of lock bar
located at the center of machine.
CAUTION
Remove ROPS before starting lifting work.
1) Put wire ropes securely on the hook and lifting points as shown.
NOTE: Use appropriate wire rope size.
2) If wire ropes make contact with other parts of the
machine, put pieces of cloth or wooden blocks at the
contact points. Carefully perform lifting.
3) When lifting, keep the machine properly balanced.
WARNING
Make sure wire ropes are not damaged.
Summary of Contents for SW880-1
Page 4: ......
Page 82: ...3 PERIODIC MAINTENANCE 78 3 3 Periodic Maintenance Points...
Page 101: ...3 PERIODIC MAINTENANCE 97...
Page 104: ...3 PERIODIC MAINTENANCE 100...
Page 110: ......