9-015
INSPECTION AND ADJUSTMENT
11. ADJUSTMENT OF F-R LEVER LINKAGE
11-1. Adjustment
• If F-R lever linkage was replaced, make an adjustment in
accordance with procedure described below.
• Neutral position of F-R lever (1) and maximum stroke on
forward-reverse side are positioned by notches.
①
Firmly secure F-R lever in neutral position.
②
Firmly secure both ends of control cable (2).
★
Specified dimension of control cable ends
a : 170 mm (6.69 in.)
★
Specified dimension of control cable ends
b : 172 mm (6.77 in.)
③
Confirm stroke of control lever (3) on propulsion pump
side.
★
Specified dimension of control lever
c : 22 mm (0.9 in.)
R2H-2-09019
N
VIEW A-A
2
1
a
R2H-2-09015
2
3
c
c
b
R2H-2-09018
A
A
Summary of Contents for R2H-2
Page 1: ...R2H 2 SHOP MANUAL 3498 66344 0 ...
Page 8: ...SAFETY ...
Page 16: ...SPECIFICATIONS ...
Page 23: ...ENGINE AND CONTROLS ...
Page 30: ...HYDRAULIC SYSTEMS ...
Page 47: ...ELECTRICAL SYSTEM ...
Page 53: ...DRUM ...
Page 58: ...BRAKE ...
Page 61: ...WATER SPRAY SYSTEM ...
Page 63: ...INSPECTION AND ADJUSTMENT ...
Page 79: ...TROUBLESHOOTING ...